BidVertiser

$328,707.47

I've Already Made Over $328,707.47 In One Month Using This!
http://www.MakeMoney.com/
Workover Rigs - Maintenance

Workover rig count is a measure of the industry's investment in the maintenance of oil and gas wells. The Baker-Hughes workover rig count includes rigs involved in pulling production tubing, sucker rods and pumps from a well that is 1,500 feet or more in depth.

Workover rig count is another measure of the health of the oil and gas industry. A disproportionate percentage of workovers are associated with oil wells. Workover rigs are used to pull tubing for repair or replacement of rods, pumps and tubular goods which are subject to wear and corrosion.

A low level of workover activity is particularly worrisome because it is indicative of deferred maintenance. The situation is similar to the aging apartment building that no longer justifies major renovations and is milked as long as it produces a positive cash flow. When operators are in a weak cash position workovers are delayed as long as possible. Workover activity impacts manufacturers of tubing, rods and pumps. Service companies coating pipe and other tubular goods are heavily affected.

U.S. Workover Rigs and Crude Oil Prices

OPENTRACKER